In the heart of Denver's fast-moving infrastructure development, few projects capture the complexity and coordination required like the Broadway Station @ I-25 Phase 1. GDT Traffic Control was proud to partner with DOTI and Kraemer North America on this transformational effort to improve traffic flow and public transit access while maintaining safety and minimizing disruptions. With nearly $1 million in contract scope and an 18-month timeline, GDT brought precision, communication, and adaptability to the front lines of traffic control.

The aerial view reveals the complexity of this major infrastructure project. Located at the critical junction of Broadway and I-25, the project site presented unique challenges with high traffic volumes, limited real estate, and the need to maintain access for public transportation users. This bird's-eye perspective helped our team develop comprehensive traffic control strategies that would accommodate all users while enabling efficient construction progress.
The Broadway Station @ I-25 Phase 1 project was spearheaded by Kraemer North America as the prime contractor, with oversight and collaboration from Denver's Department of Transportation and Infrastructure (DOTI). As the dedicated traffic control partner, GDT Traffic Control played a crucial role in ensuring smooth transitions, safety, and timely completion.
Key project details:
The project focused on improving traffic and transit flow near the busy Broadway Station area by modifying highway access and enhancing RTD infrastructure:
These upgrades aimed to decongest the corridor, increase transit accessibility, and align with the long-term vision for smarter transportation throughout the Denver metro area.
Large infrastructure projects come with a built-in set of challenges—and this one was no exception. With high traffic volumes, limited real estate, and pressure to maintain access for public transportation users, GDT had to operate with precision and adaptability from day one.
Key traffic control challenges included:
This required a careful balance between construction needs and maintaining daily access and usability for thousands of commuters and transit riders. GDT played a pivotal role in ensuring that these disruptions were managed proactively and clearly communicated to the public.
What sets GDT apart is more than cones and signage—it's our ability to anticipate, adapt, and execute under pressure. This project showcased GDT's core strengths: collaboration, safety-first planning, and communication.
Here's how GDT approached the project differently:
Despite the complexity and unpredictability of a major urban infrastructure project, GDT delivered measurable results. The traffic control portion of the Broadway Station @ I-25 project was completed on schedule and without major incidents, reflecting GDT's commitment to safety, communication, and operational excellence.
By closing an outdated ramp and adding streamlined access routes, the final configuration greatly enhances traffic efficiency for commuters and transit users alike. More than just redirecting cars, GDT helped redesign the daily rhythm of a key Denver thoroughfare.
GDT Traffic Control's role in the Broadway Station @ I-25 Phase 1 project is a case study in how professional traffic management is vital to successful infrastructure upgrades. With nearly a million dollars in scope and a heavily trafficked corridor to manage, GDT delivered on its promise: safe, smart, and smooth traffic control from start to finish.
Whether you're building a new corridor or revitalizing a high-traffic transit hub, GDT is the trusted partner for keeping Colorado moving—one flag, one ramp, one bus lane at a time.
Need traffic control services or have questions? We're here to help. Contact us today for a free consultation.